Topside Works, NFE.
12 “and 6” poliduct pipe relocation on Route 10, Coco-Moro section, zone of Siquirres, Costa Rica
Topside Works, NFE. Read More »
12 “and 6” poliduct pipe relocation on Route 10, Coco-Moro section, zone of Siquirres, Costa Rica
Topside Works, NFE. Read More »
12 “and 6” poliduct pipe relocation on Route 10, Coco-Moro section, zone of Siquirres, Costa Rica
Hokchi Shore Approach Rehabilitation Read More »
12 “and 6” poliduct pipe relocation on Route 10, Coco-Moro section, zone of Siquirres, Costa Rica
Hot Tap Submarine, TC Energy Read More »
12 “and 6” poliduct pipe relocation on Route 10, Coco-Moro section, zone of Siquirres, Costa Rica
Engineering, Transport and Installation of Maritime Lines and Submarine Cables Read More »
Construction of a 2 km x 20″ submarine pipeline and existing gas pipeline interconnection.
Engineering, Procurement and Construction of two units of marine infrastructure.
Marine Pipelines, Package C Read More »
Engineering, Procurement and Construction of two pneumatic pumping gas pipelines.
Pneumatic Pumping Lines. Read More »
Engineering, Procurement and Construction of two marine pipelines.
Campo Xanab Marine Pipelines Read More »
Engineering, Procurement and Construction of an oil pipeline.
Campo Tsimin oil pipeline Read More »