Under Execution

WP4 A1 — Bahr Essalam Field, Libya

Arendal is executing this project under an EPIC (Engineering, Procurement, Installation, and Construction) model, aiming to ensure continued gas production from the Bahr Essalam field amidst its natural decline. The scope encompasses the construction and installation of an 18-inch diameter, 43-kilometer-long offshore multiphase pipeline connecting the new WHPA platform to the existing Sabratha platform, operating at water depths ranging from 96 to 190 meters. The project also includes the installation of fiber-optic cables and subsea umbilicals associated with the offshore production system, establishing an integrated infrastructure that guarantees the field’s operational continuity.

Key activities

  • Offshore installation of an 18-inch diameter multiphase pipeline.
  • Installation of fiber optic (FO) cable.
  • Installation of subsea umbilical cables.
  • Offshore transport and execution of operations using a specialized marine fleet (marine spread).
  • Tie-ins and integration with existing offshore infrastructure.
  • Associated subsea and offshore construction activities.