Main Projects of Power
						Substation with voltages of 115 and 13.8 kV					
				
							Macuspana substation and transmission line
						20-22 MW turbogenerator for the North Power Plant of the Ing. Antonio M. Amor Refinery					
				
							Replacement of the Salamanca Turbogenerator
						Generation plant for the Cantarell nitrogen plant, GE 6FA turbine with a HRSG Nooter.					
				
							Cantarell Generation Plant Module 5
						525 MW combined cycle generation plant with 2 GE 7FA CTG turbines and 1 Toshiba STG turbine					
				
							Valladolid III Combined Cycle Plant
						Combined Cycle Generation Plant of 540 Mw. 2 x 2 GT24 CTG.					
				
							Rosarito III Combined Cycle Plant
						484 Mw Combined Cycle Generation Plant. 2 X 2 GT24 CTG.